Equipment and Generator Pads in Nashville and Middle Tennessee
Foundations and Structural Concrete

Equipment and Generator Pads

Level, durable concrete pads for generators, HVAC units, pool equipment, tanks and utility cabinets, sized to the equipment.

Heavy equipment likes a level, steady, dry surface. A standby generator, an air conditioner, a pool pump or a propane tank all do better on concrete than on the ground, where they sink, tilt and rust. Pads also keep vibration down, protect equipment from splashes and meet manufacturer clearances. A pad for a Nashville home often has to fit between the house, a fence and a utility easement, so the size and placement need thought before any concrete arrives.

We start with the equipment specs: dimensions, weight and the clearances the manufacturer and the code ask for. We dig the area, compact stone and form the pad slightly larger than the base with a very slight slope so water runs off. Steel gives strength, and conduit sleeves or anchor bolts can be set as needed. The surface is troweled flat and the edges are rounded. We cure the pad and tell you when it is ready for the installer to set the equipment. We also review clearances, conduit paths and drainage with you or your electrician, so the pad is placed and sloped correctly before any equipment arrives on site.

Sized to the equipment

We use the manufacturer specs for size, weight and clearances, so the pad fits.

Flat with a drain slope

A flat surface with a slight pitch keeps equipment level and sheds water.

Reinforced

Steel keeps the pad from cracking under the load.

Sleeves and anchors

Conduit and anchor bolts can be placed in advance for a clean installation.

What is included

  • Review of equipment specs
  • Excavation and stone base
  • Forms, steel and sleeves
  • Pour and finish
  • Curing
  • Handoff to the installer
Before and after

See the transformation.

Drag the handle to compare.

After: front entry steps with solid new steps with clean edges and a handrailBefore: front entry steps with crumbling, cracked steps with a loose railBeforeAfter
Crumbling steps rebuilt. From crumbling, cracked steps with a loose rail to solid new steps with clean edges and a handrail.
Why it works

What you get with Equipment Pads

Equipment ready

Level base.

Right size

Per specs.

Sheds water

Slight slope.

Reinforced

Holds weight.

Sleeves set

Planned early.

Cured and ready

For installers.

Try it now

Concrete Volume Calculator: How Many Yards Do I Need?

Enter length, width and thickness to see cubic yards, bags and truck loads for a slab, with a waste allowance.

How it works

Our process, start to finish.

  1. 01

    Call and schedule

    You tell us about your site and what you want, new concrete, a repair or a refresh, and we set a visit that fits your day.

  2. 02

    Visit and measure

    We walk the property, measure the area, check drainage, soil and access, look at any old concrete and take photos of anything of note.

  3. 03

    Plan and explain

    We explain your options for thickness, steel, finishes and colors, sketch the layout and give you a written scope with clear timing and pricing.

  4. 04

    Prepare the site

    We arrange for underground utilities to be located, protect the house, lawn and landscaping, remove old concrete if needed and compact a stone base.

  5. 05

    Form and pour

    We set forms and steel, check heights and slopes, place and finish the concrete and cut joints, with the crew on site from the first truck to the last pass.

  6. 06

    Cure and care

    We protect the concrete as it cures, clean up the site, walk you through when to use it and seal it, and set a reminder for your next check.

Questions

Equipment Pads FAQ

How big should a generator pad be?

Usually a few inches wider than the base on every side, with the manufacturer clearances. We follow the specs.

How thick is an equipment pad?

Four inches is common, with more for heavy loads. We size it to the weight.

Can you pour a pad by the house?

Yes, with care around foundations, drains and utilities.

Does a pad need a permit?

Sometimes, especially for generators. We help you check.

How long until the equipment can go on?

Usually after a few days of cure. We give you exact timing.

Next step

Get your free Equipment Pads estimate.

Tell us about the project and we will call you back to talk it through.

Or call (615) 357-7797 to talk now.

Tell us about your project

We will call you back to talk it through and set up a visit.

Prefer to talk? Call (615) 357-7797. We never sell your information.

Call NowFree Estimate